Prearrangement for optional three-way bypass valve for switching between Heating and Domestic Hot Water, with probe for checking remote boiler temperature, for MK 50 and MK 70 versions only. (prearrangement for DHW external circulator control, for the whole range).
Time programming for boiler preparation.
Siphon for draining condensation.
Connections for air intake and fume discharge ducts with combustion control plugs.
Solar management directly from the boiler with additional card (Optional).
Management of mixed area with additional card (Optional) (3-point control) and/or solar system control.
Wiring for control (0-10 Volt) for single installation.
Smile Energy 160 and 160 SP are provided with LPG (G31) conversion kit.